|
- I.
|
- Unmanned Lunar Exploration and
the Need for a Lunar Orbiter.
- - The call for a
program of exploration.
- - Mustering for the
challenge of space.
|
|
- II.
|
- Toward a Lightweight Lunar
Orbiter.
- - The Surveyor
program.
- - Early Apollo
impact on lunar orbiter planning.
- - The Centaur
rocket program.
- - The search for a
lightweight orbiter.
- - OSS-OMSF
cooperative planning.
- - The Scherer
group's report.
- - Problems at
JPL.
- - Langley enters
the picture.
- - Establishing
management arrangements.
- - Langley develops
the request for proposal document.
- - Stipulations of
the request for proposal document.
|
|
- III.
|
- Beginning the Lunar Orbiter
Program.
- - Congress
questions NASA on orbiter.
- - The lunar orbiter
project office is established.
- - Preparing for
contract bids.
- - The Langley
source evaluation board.
- - The lunar orbiter
proposals.
- - The Boeing lunar
orbiter proposal.
- - The Eastman Kodak
photographic system.
- - Selecting the
lunar orbiter contractor.
|
|
- IV.
|
- NASA and Boeing Negotiate a
Contract.
- - Early Boeing
preparations.
- - NASA preparations
for contract negotiations.
- - Congressional
criticism of contractor choice.
- - No duplication of
effort.
- - NASA solely
responsible for photographic data.
- - Langley-JPL
working relations.
|
|
- V.
|
- Implementing the
Program.
- - Early funding
considerations.
- - Boeing
negotiations with subcontractors.
- - NASA
cost-reduction efforts.
|
|
- VI.
|
- The Lunar
Orbiter Spacecraft.
- - A general
description.
- - Early design,
fabrication, and testing problems.
|
|
- VII.
|
- Building the Spacecraft:
Problems and Resolutions.
- - Experiments for
lunar orbiter.
- - Other potential
experiments.
- - Preliminary
mission planning activities.
- - Testing
procedures and program reviews.
- - Problem areas:
Last quarter 1964 to first half
1965.
|
|
- VIII.
|
- Lunar Orbiter Mission
Objectives and Apollo Requirements.
- - OSSA and OMSF
Planning Activities.
- - Developing mission
designs.
- - The ad hoc
Surveyor/Orbiter utilization committee
(SOUC).
- - Presentation of
mission A.
- - Funding and
technical problems - 1965.
- - The status of the
Boeing contract.
- - Spacecraft
compatibility with launch and tracking
facilities.
- - Flight recording
equipment.
- - A change in delivery
incentive.
|
|
- IX.
|
- Missions I, II, and III:
Apollo-Site Search and Verification.
- - Preparations for the
first launch.
- - The first
launch.
- - Results of the first
mission.
- - Prelude to mission
II.
- - The plan for mission
II.
- - The second
mission.
- - The third orbiter
mission.
|
|
- X.
|
- Missions
IV and V: The Lunar Surface Explored.
- - Preparing for the
fourth mission.
- - The fourth orbiter
mission.
- - Preparations for
the fifth mission.
- - Lunar orbiter V
mission objectives.
- - The final
mission.
- - The end of the
operational phase.
|
|
- XI.
|
- Conclusions: Lunar Orbiter's
Contribution to Space Exploration.
- - A sixth orbiter
mission?
- - Apollo mission
planning and lunar orbiter data.
- - Results of
non-photographic lunar orbiter
experiments.
- - A meaning for the
lunar orbiter achievements.
|
|
- XII.
|
Lunar Orbiter
Photography.
|
|